Drawn to the standard.

We check every design against the laws, standards and guidelines that apply to underground cables and pipelines. On top of that, we follow our own rules that no standard requires. We keep the two deliberately separate.

LegendLine types · NLCS
  • MV 10 kVNew
  • LV 0.4 kVNew
  • Gas LPNew
  • WaterNew
  • DataDuct
  • Existing lineKLIC
  • Directional drillingHDD
  • Trial trenchPS
Standards map

Which standard, in which phase.

For each standard you see where it plays a role in the project. Filter by topic or choose a phase.

All phases
StandardWhat it covers
NLCSDutch CAD standardLayers, line types and symbols on every drawing, so it opens at the grid operator and contractor as intended.Preliminary designDetailed designHandover
BGTLarge-scale topography registerThe national large-scale map we use as the base for route drawings.Intake and KLICPreliminary designDetailed design
RD · NAPDutch national grid and Amsterdam Ordnance DatumCoordinates and heights of design and survey, transformed according to RDNAPTRANS™.Trial trenchesDetailed designHandover
IMKLInformation model for cables and pipelinesThe data model in which a KLIC delivery arrives and which we process per theme.Intake and KLIC
WIBONDutch act on underground network informationOrientation request in the design phase and excavation notification before mechanical digging, via the Kadaster’s KLIC.Intake and KLICTrial trenches
CROW 500Guideline for preventing excavation damageThe division of roles between client, designer, grid operator and excavator, with a risk assessment per interface.QuickscanPreliminary designTrial trenchesDetailed design
VCASafety, health and environmentOur field team works VCA certified during trial trenches and surveys.Trial trenches
NEN 3140Operation of electrical installationsArrangements and authorisations for work near live cables.Trial trenches
NEN 3650Requirements for pipeline systemsStrength, stability and loads in the design of pipelines.Preliminary designDetailed design
NEN 3651Additional requirements near hydraulic structuresCrossings of flood defences, waterways and main roads: the standard the asset owner checks the design against.Preliminary designDetailed design
Grid operatorsLiander, Stedin, Enexis and other grid operatorsDesign and drawing requirements per grid operator: materials, burial depth, clearances and the format in which drawings and as-built data are delivered.Preliminary designDetailed designHandover
Asset ownersProRail, Rijkswaterstaat and water boardsSpecific requirements for crossings with railways, national roads and waterways, per asset owner.Preliminary designDetailed design
OmgevingswetEnvironment and Planning Act and water board bylawsThe framework for environmental permits and water permits, since 1 January 2024.QuickscanDetailed design
AVOIBylaw on underground infrastructureMunicipal rules for the consent decision, the works and the reinstatement of public space.Detailed design
KNADutch archaeology quality standardThe starting point when the route crosses an area with archaeological expectations.Quickscan
WSCS-OCEDetection of conventional explosivesThe framework for desk research and detection where unexploded ordnance is expected.QuickscanTrial trenches
CROW 400Working in and with contaminated soilSafety measures when the quickscan or a trial trench points to contamination.QuickscanTrial trenches
DNR 2025De Nieuwe Regeling 2025The standard terms for consultancy and engineering firms in the Netherlands. They govern the assignment, liability and handover, and go out with every quotation.Intake and KLICHandover
We apply standards in the version that applies at the time of the assignment, unless agreed otherwise.Your approval
Our own practice

What we add ourselves.

None of this is in any standard. These are rules we impose on ourselves, because they make it traceable afterwards who did what.

  1. Four eyes on every drawing

    Whoever makes a drawing does not approve it. A second engineer checks every drawing before it reaches you.

  2. Approval on a fixed version

    An approval applies to one specific version of the document. If anything changes afterwards, a new version and a new review follow.

  3. Everything traceable

    Every upload, download, change and approval is in an activity log that cannot be altered afterwards.

  4. Data in Europe

    Drawings and project data are stored encrypted on our own server in Germany, accessible only with two-factor authentication.

Example

Tekent voor zekerheid
ProjectLV network replacement, Kerkweg
DocumentDO_trace_blad-03.dwg
Rev.C
Scale1:500
DrawnJ. de VriesEngineer · 02/10/2026, 14:12
CheckedM. BakkerLead engineer · 03/10/2026, 09:40
ApprovedClientApprover · 06/10/2026, 16:05
Fingerprintsha256 · 9f3c 41ab 7e02 c815 · · · 0b6e d5c8
An engineer and a site manager discuss the risk classes of a crossing on a laptop, with route drawings on the table.

CROW 500 in practice.

Each interface gets a risk class, a measure and an alignment status per grid operator. Before construction, it is clear where extra care is needed and who is responsible for it.

  1. Risk class per interface
  2. Measure, such as a trial trench or hand digging
  3. Alignment status per grid operator

A question about a standard or an asset owner’s requirement?

Put it to one of our engineers. We will take a look, even if your project is still in the exploration phase.