Trial trenches where they matter, dug and surveyed by our own team. We record the actual position of cables and pipelines before the design is finalised.
Each component can be ordered separately. Together they form one drawing that you see grow in the client portal.
D.03 · Trial trenches · 1:5004 / 4
>Command:X 155 212 · Y 463 118 · RD
03.1
Trial trench plan
We determine where a trial trench is needed: at high-risk interfaces, unclear positions and crossings. For each trench we record its purpose, dimensions and the cables and pipelines we expect to find.
ResultTrial trench plan with locations and purpose per trench
03.2
Site walk and preparation
Before we dig, we walk the locations: trees, paving, driveways and manholes. With a current KLIC notification and agreements with the grid operator, every trench is prepared in advance.
ResultPrepared locations with KLIC and agreements
03.3
Digging and surveying
We dig the trial trenches by hand or supervise the contractor. Every cable and pipeline found is surveyed with RTK-GNSS: position, depth, diameter and material, in RD and NAP.
ResultSurveyed points and photos per trench
03.4
Reporting and feedback
For each trench we record what we found and what it means for the design. Deviations are processed straight into the drawing.
ResultTrial trench report and updated design
Input and output
What you provide and what you get back.
01
What we need from you
Don’t have everything yet? A proposed route or a question is enough to start.
01Route or work area, on a map or as a drawing
02KLIC delivery, or we file the notification
03Desired locations or the interface register
04Contact person and any access arrangements
D.03
02
What you receive
Everything is stored in your project file in the client portal, also after handover.
PDFTrial_trench_report_PS01-PS06.pdfPer trench: photos, positions and depths
CSVSurvey_RD_NAP.csvSurveyed points with X, Y and Z
DWGDesign_rev-C.dwgDesign updated with the findings
PDFTrial_trench_plan.pdfLocations and purpose per trench
We dig where it matters.
A KLIC delivery gives an indication, not a guarantee. A targeted trial trench tells you where you stand before construction starts.
At interfaces with a high risk class, where the KLIC delivery is unclear, and at crossings where the exact depth matters. In the trial trench plan we substantiate why each trench is needed.
02
Do you dig the trial trenches yourselves?
Trial trenches and surveying are done by our own team. If you use your own contractor for the digging, we supervise the trenches and do the survey.
03
Do you work safely on site?
Our field team is VCA certified and always works from a current KLIC notification. On site we follow the safety agreements of the client and the grid operator.