The best route from A to B for medium voltage, low voltage, gas, water and data. From first route study to a buildable design to NLCS and the grid operator’s requirements.
Intake and KLIC, Preliminary design, Detailed design, Handover123456
Deliverables
DWG · DXF (RD) · PDF
Standards and frameworks
NLCS · CROW 500
Components
What we do, layer by layer.
Each component can be ordered separately. Together they form one drawing that you see grow in the client portal.
D.01.1 · Route engineering · 1:5004 / 4
>Command:X 155 212 · Y 463 118 · RD
01.1.1
Route study and feasibility
We map the assignment and work out one or more routes from A to B. For each alternative we identify the bottlenecks: crossings, space in the profile, trees, ownership and permit requirements.
ResultRoute advice with alternatives and a substantiated preference
01.1.2
VO, DO and UO
We develop the chosen route from preliminary design through final design to construction design. Drawings to NLCS and each grid operator’s requirements, with dimensions, cross-sections and details.
ResultDrawing set per phase, with your approval of VO and DO
01.1.3
Crossings along the route
We record where the route crosses roads, watercourses and railways, and which technique fits each crossing. Where a trenchless crossing is needed, the bore design follows in the same file.
ResultCrossing overview with the technique per crossing
01.1.4
Interfaces to CROW 500
We identify where the route meets existing cables and pipelines. Each interface gets a risk class, a measure and an alignment status per grid operator.
ResultInterface register and CROW 500 project document
Input and output
What you provide and what you get back.
01
What we need from you
Don’t have everything yet? A proposed route or a question is enough to start.
01The proposed route, or the question to define one
02Grid operator and discipline (MV, LV, gas, water, data)
03Desired schedule and any construction date
04Available drawings, KLIC delivery or earlier studies
D.01.1
02
What you receive
Everything is stored in your project file in the client portal, also after handover.
DWGDO_route_sheet-01-04.dwgRoute drawing per phase, to NLCS
DXFDesign_RD.dxfDesign in RD coordinates for your own CAD
PDFRoute_advice.pdfAlternatives with a substantiated preference
PDFInterface_register.pdfRisk class and measure per interface
A route that works on paper and in the trench.
Because design and fieldwork sit with one team, we verify the design with a trial trench where needed. What we find goes straight into the drawing.
Yes. We draw to the Dutch CAD standard NLCS, supplemented by the grid operator’s specific requirements. If you use your own drawing standard, we agree on it in advance.
02
In which format do you deliver?
Drawings as DWG and PDF, and the design as DXF in RD coordinates, so you can use it directly in your own CAD or GIS environment.
03
How do I know a drawing is right?
Every drawing is checked by a second engineer before it is sent to you. In the client portal you then approve or reject it, with a note.